the meadoway toronto

This is how Toronto's massive 16 km linear park will look when it's finished

The 16 kilometre park that will eventually run all the way from the Don River ravine to Rouge National Urban Park is a few steps closer to being complete, and these renderings and visuals give a sneak peek into what it'll look like. the meadoway toronto

Rendering of a trail intersection in The Meadoway. 

The Toronto Region Conservation Authority (TRCA) has been working with the City of Toronto to transform the once barren (save for the power lines) Gatineau Hydro Corridor in Scarborough into a lush meadowland to be known as The Meadoway.

the meadoway toronto

Rendering of the multi-use trail surrounded by meadows. 

Once finished, it'll be a fully connected multi-use trail for biking, walking and jogging complete with trail intersections and road crossings.

It will be the largest linear urban park in Canada. the meadoway toronto

Photo of the vibrant meadows that are already growing in the area. 

Since they broke ground in 2018, the section extending from Brimley Road to Scarborough Golf Club Road has been completed, and now features 3.5 kilometres of continuous trail.

the meadoway toronto

Rendering of the urban agriculture and gardens that will cover a previously empty area. 

About 67 hectares, so half of the entire park, has also been seeded with native meadow plant species since the fall of 2020. It's now filled with wildflowers, butterflies and birds. 

the meadoway toronto

Rendering of wetland and informational plaques that will soon be at the Meadoway. 

They've also just started at Highland Creek on the section extending from Scarborough Golf Club Road to Neilson Road, which is said to be completed by the end of 2022. This will include a large pedestrian bridge to connect The Meadoway with the other trail in the area.

The remaining gaps in the trail network, including the area extending from Kennedy Road to Brimley Road and from Neilson Road to Conlins Road, are still being designed.

the meadoway toronto

Rendering of the road crossing at Neilson Road. 

The entire $40-million project that will eventually connect four different ravines, 15 parks, 34 neighbourhoods, over 500 acres of land and more than 1,000 diverse species of flora and fauna is on track to be completed by the end of 2024.

the meadoway toronto

Rendering of a bird-eye view of the eastern entrance. 

Although we'll still have to wait a little longer for the final product, there's no reason we can't visit a portion of it this winter before the meadows start to bloom. 

Photos by

Toronto and Region Conservation Authority (TRCA), Future Landscapes and Perkins & Will


Latest Videos



Latest Videos


Join the conversation Load comments

Latest in City

Canada Dental Benefit now accepting more people and here's who can apply

Toronto's top doctor doubles down on plan to decriminalize all drugs for personal use

Ontario might have to wait another whole month for sizzling summer weather

Ontario high school kids are playing a viral TikTok game terrorizing locals

Someone sabotaged Toronto's most notorious speed camera and locals are fuming

This might just be the saddest 'dog play area' in all of Toronto

Public transit around Ontario is about to get way faster thanks to fancy new tech

Future of Toronto's bike share system on the rocks amid tension with City